Jilin Petrochemical Company's hydrocracking unit safe and smooth parking

Drying equipment

The hydrocracking unit of Jilin Petrochemical Company was safely and smoothly stopped, and the process was successfully delivered and overhauled. During the oxygen measurement and explosion testing of the inspection equipment, the company strictly sampled and analyzed the management, and implemented the double double instrument double confirmation inspection system, which provided a reliable guarantee for the smooth delivery and inspection of the equipment.

PVC/PVG Conveyor Belt

Pvc Conveyor Belt,Pvg Conveyor Belt,High Strength Conveyor Belt

Heat Resistant Conveyor Belt Steel Cord Conveyor Belt Co., Ltd. , http://www.nsepconveyorbelt.com

Posted on