Five provinces jointly strengthen access to phosphate rock development

Drying equipment

China Drying Network News Hubei Provincial Department of Land and Resources announced five policies for the management of phosphorous resources in the five provinces of Hubei, Sichuan, and Jiangxi, and the five provinces jointly strengthened access to development of phosphate rock and raised barriers to entry. Focus on regulating the total amount of annual exploitation of phosphate rock and promoting the rational development and utilization of phosphate rock.

The five policies include the "Administrative Measures for the Development of Resources for the Exploitation of Phosphorite Resources in the Hubei-Chongqing-Cenchuan Basin", the "Regulations for the Management of the Mining Rights in the Hubei-Chongqing-Chongqing Phosphorus Mine" "Measures," "E-Hunan Chuanyu Phosphorus Mine Supervision Joint Inspection and Control Measures," "Phosphate Enterprise Social Responsibility Annual Reporting System."

According to the “Administrative Measures”, the mining right (application) person is in principle required to be an integrated enterprise of mining, mineral fertilizer or mineralization. The production scale of small-scale phosphate ore mines is 150,000 tons/year or above; the production scale of medium-sized phosphate mines should reach 300,000 tons/year or more; the scale of mine production in large-scale phosphate mines should reach 500,000 tons/year; For phosphate rock areas with a grade below 20%, the minimum construction scale may be lower than the above criteria. The medium-low grade ore shall, in principle, be sold directly after the beneficiation by selling phosphate concentrate or using wet process phosphoric acid.

The "Administrative Measures" stipulates that the total number of mining rights for phosphate rock and the total amount of designed mining capacity shall be controlled. Each provincial administrative department of land and resources shall propose a plan for the release of phosphate mineral resources in the province in the next year before the end of each year. The five provinces joint meeting reviewed and confirmed the five provinces phosphate mineral resources release program, reported to the Ministry of Land and Resources for the record.

The "Administrative Measures" pointed out that the annual total control of phosphate rock mining includes the annual total amount of raw ore mined and the amount of converted ore (P2O5 is 30%). The total control indicators are measured using a base-line measurement algorithm, based on the total amount of mining control indicators issued this year, combined with national regional economic policies and related factors, and considering the nuclear increase and reduction factors. Before the end of October each year, each province proposes the province's mining plan for the next year, which will be determined by the joint review of five provinces.

The "Administrative Measures" requires the reporting system for the implementation of phosphate rock resources development and utilization. Phosphate mining enterprises must establish quarterly deposits of mineral resources reserves, strictly control the production of over-planned mining rights, and the disorderly distribution and sales of phosphate resources.

Weigh Bridge

Truck Scale,Weighbridge Used Truck Scale,Export Scs Truck Weighing Scale

Crane Scale,Hanging Scale Co., Ltd. , http://www.topweighing.com

Posted on